Automatic High Security Razor Barbed Wire Machine Factory
specification of Razor Barbed Wire machine used for airport fencing with Galvanized and PVC Coated Main machine razor barbed wire machine Coiling machine Type voltage power producing speed weight Overall  dimension L*W*H voltage power producing speed weight Overall  dimension L*W*H five strip 380v 2.2 kw (220-280)m/h*5 1500kgs 1200*1000*1900 380v 2.2kw 80 kg/h 300kgs 1100*750*1200 Nine strip 380v 2.2kw (220-280)m/h*9 2200kg  380v 2.2kw 80 kg/h 300kgs 1100*750*1200 This apparatus is made for specializing in the razor barbed wire, mainly divided into two parts: 1.The steel belt presses judges part: Adopt JB-23 press machine, pressure 25T 2. Some of taking shape machine of one pack of lines: Wrap up the steel wire and razor blade steel band together, do a round long network that needs. feature of Razor Barbed Wire machine used for airport fencing with Galvanized and PVC Coated razor barbed wire machine produce razor barbed wire ,The razor wire machine is composed of the main machine producing strip plates and the coiling machine that coils the wire into the strip plate. Razor barbed wire machine is light, easy to operate, high efficient. Using this type of razor barbed wire machine can save you twenty percent of raw materials in production. Delivery Detail ofRazor Barbed Wire machine used for airport fencing with Galvanized and PVC Coated 30-45 days after payment Packaging Detail of Razor Barbed Wire machine used for airport fencing with Galvanized and PVC Coated wooden pallet and plastic package in the container. After-sales service: We offer installation and train the workers for the customers. After-sales service Name:Hannah  Tel:008618032888739   Women'S Skirt,Women'S Dress,Women'S T-Shirt,Women'S Blouse Shaoxing Holly Garments Co., Ltd. , https://www.hollygarment.com
description of Razor Barbed Wire machine used for airport fencing with Galvanized and PVC Coated
Â
Â
 Our guarantee time: one year since the machine was installed at buyer's factory but within 18 months against B/L date.
1.Maintenance period: one year
2.Training how to install the machine, training how to use the machine.
3.Engineers available to service machinery overseas.
4.Test the machine before shipmentÂ
5.Provide technical guidance relate to use the machineÂ
6.Provide the spare parts at cost price after warranty periodÂ
7. Collect the feedback for the machine workingÂ
Â