Refrigerator Moulding Injection Mold/Hrd-Z092904
Heavy Duty Diesel Engine Oil,Heavy Duty Oil,Heavy Duty Engine Oil,Heavy Duty Diesel Oil Inner Mongolia Mengkai Import and Export Trading Co.,Ltd. , https://www.mkheavytruck.com
Mould Life: 50~100 shots
Material: PP
Cavity: 1*1
Applicable range: Home appliance
Lead Time: 35-45 days
Hot runner: (according to the customer's request and product style)
Standard part: PUNCH, MISUMI
First trial equipment: 380T Injection Machine( moreover we also have 90-700T, 750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.
Process step: Product design- CAE- 3D mold design- 2D drawing- CAM- Milling machine- Grinder- Drill- CNC- Wire cutting- EDM- Polishing- Trial assembly- Grind- Assemble- First trial
Our service: Product and mould design, Injection mould and parts machining.
Our main customer: Haier, Hisense, Midea, Siemens, SANYO, ELX, Toyota, Kia, Foton, GM Wuling, Great wall, Hyundai, Skyworth.
Overseas market: Japan, Korea, Thailand, Russia, Germany, England, Norway, Italy, USA, Spain, Turkey, Denmark, Brazil, Argentina, Egypt, South Africa, Iran, Pakistan, India.
Mould painting: According to Customer's request
Package: Wooden Case
The first trial success rate is above 95%
Quotation: Provide quotation in 24hours after received the customer's drawing.
The profile: 2D/3D drawing or samples
Manager: Concentrate on project tracking and after service
Engineer: 30-50 excellent engineers, have many years experience and English communicating well.
The purchase department use EPR system to make sure buying materials in time.
70-130 experienced workers can meet the customer request of batch production.
Quality department: 15 members quality control workers, testing the mould and parts by CMM and projector.
Domestic delivery: Logistics transportation
Delivery to overseas: FOB/CIF/DDU by sea shipping or air shipping
Fitter
Quality testing
First die by the fitter for a thorough inspection of the mold as follows:
Die ring balance? Tap hole and the nozzle threaded holeare concentric rings, and there is no interference?
 Core spray anti rust agent, thimble ejection is smooth, mould parts are complete, the slider is smooth, faucet installation      Â
The slider, the top block, fixed, dynamic model is Water Leakage? (0.5-1.5Mpa*5 minutes to keep)
According to the customer request is equipped with the factory.
Water, oil flow, no residual iron, remains in the mold cooling water, gas removal
 Ensure the mold factory 100% acceptance (including:assembly, test mode etc.)
Travel or stop switch is installed? Mold plate is installed?
Die appearance: water mark, mark, mark rings hole templateare complete; the surface rust are clean, then coated withanti rust oil, wooden packing.
Mandril reset is smooth, set out is smooth, no blocking, no abnormal sound; slide block moves smoothly?
With mold factory data and CD etc.
Oil cylinder action normal? Template, reference angle,water, oil, gas path identification and numbering, ejecting hole is in accordance with the requirements of injection molding machine?
Â
The positioning ring compliance requirements? Rubbersleeve ball R is consistent with the injection molding machine?
Â
The support legs refuse nail is installed, and highlyconsistent? Support column is higher than the mold foot?Locking device is installed?
Â
If the exhaust slot? Hot runner wiring shall be binding, with plate cover, to prevent the assembly pressure off the wire,hot runner heating wiring is correct, reliable and so