SAE J30 R9 AEM 5/16 Inch Rubber Hose Auto Parts
Circulating Cooling Water Equipment Circulating Cooling Water Equipment,Cooling Circulating Water Bath,Recirculating Cooling Water Equipment,Cooling Water Equipment Suzhou Weizhi Water Treatment Equipment Co., Ltd , https://www.wzsclequip.com
                                         SAE J30 R9 AEM 5/16 inch rubber hose auto parts
Applications:
Designed specially for auto and truck fuel injection systems, use with gasoline, diesel, bio-diesel ,E-85, methanol, ethanol, ethanol extended gasoline, and gasohol fuels.Â
Temperature rating : -40° F to 275° F (-40° C to 135° C)
Meet SAE 30R9 specification
Note: Do not submerse in gasoline
Â
Construction:
Tube: FKM
Buffer: ECO/ CSM
Reinforcement : Aramid Spiral
Cover:ECO/CSM
Â
Size & Technical data
Part NO.
I.D
O.D
Working pressure
Burst pressure
inch
mm
inch
mm
PSI
MPa
PSI
MPa
6001
1/8
3.2
0.35
9
225
1.55
900
6.2
6003
3/16
5
0.43
11
225
1.55
900
6.2
6005
1/4
6
0.5
13
225
1.55
900
6.2
6007
5/16
8
0.6
14
225
1.55
900
6.2
6009
3/8
9.5
0.63
16
225
1.55
900
6.2
6011
1/2
12.7
0.8
20
225
1.55
900
6.2
6013
5/8
15.9
24
0.95
225
1.55
900
6.2
6015
3/4
19
28
1.1
225
1.55
900
6.2
6017
1
25.4
30
1.2
225
1.55
900
6.2
Service
Provide OEM Manufacturing
Accept sample orderÂ
 We will reply you for your inquiry in 12 hours.
 After shipping, we will track the products for you d, until you get the products.
Could provide samples for testing.When you got the goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer the solve way for you.
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral PVC film and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: FOB, CIF, EXW, CFR, DDU.
Q4. How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Â
Â
            Â