The use of air shower equipment management and maintenance
One, automatic air shower simple operation instructions Second, the intelligent air / cargo shower detailed instructions 2.1 Turn on the 380V, 50 Hz power supply (L1, L2, L3-FireWire, N-Neutral, E-ground), turn on the work, The lighting switch confirms that the fan and lighting are working properly. At this time, the air/bleeding chamber is in the initial state and personnel can perform normal operations. Note: must be grounded 2.2 door program: 2.2.1 When the person entering the clean area opens the outer door, the electric lock of the inner door is automatically locked to prevent the unclean air in the air shower from flowing into the clean area. The air shower light is on. 2.2.2 After entering the air shower and closing the outer door, the voice prompt: "Hello, please stand in the induction zone." The system infrared sensor starts to detect if there is anybody. If someone is detected, the system will go into the air shower process. 2.2.3 Before the air shower is locked inside and outside the door, the fan starts to shower at high speed. At the same time, the timing of the wind splashing starts. Voice prompt: "Working, please rotate the body 360 degrees." 2.2.4 If the system does not detect the air shower room within a specified time after the outside door is closed, the inside and outside doors of the system are automatically unlocked and returned to the standby state. The infrared will continue to detect. If someone is detected, the inside and outside doors will be locked and the air shower will start. Wind shower. 2.2.5 During the air shower process, when someone presses up, down, and lighting switches, the voice prompts: "Working, please don't touch the switch." 2.2.6 In the process of air shower, when someone presses the emergency stop switch, the air shower will end. Press the emergency stop button again to cancel the emergency stop state. 2.2.7 After the air shower is over, the inner door is unlocked and the voice prompts: "Filling is completed, please exit from the back door". 2.2.8 After the personnel walked out of the air shower and closed the inner door, the wind began to flow at a low wind speed. After 10 seconds, the air shower was stopped and the original state was restored, waiting for the next use. 2.2.9 If the air shower is completed, the inner door is unlocked. The inside personnel did not leave the shower room at the specified time. The system default person may have left and automatically returned to the standby state. 2.2.10 After the lights are on, they are extinguished automatically if they are not triggered again within the specified time. 2.3 go out procedure: 2.3.1 Open the inner door, the outer door is self-locked and the air shower light is on. 2.3.2 When the person enters the air shower, closes the inner door, and the system starts to detect if someone is in the air shower room. If no person is detected within the specified time, the inside and outside doors are unlocked. 2.3.3 If someone is detected, the system locks the inner door when the person opens the outer door, and when the outer door is closed, the system returns to the initial state. 2.3.4 In case of special circumstances, personnel may choose to return to the clean area. The system waits for the personnel to open the inner door and the outer door is electrically self-locked. When the inner door is closed, the system returns to the initial state. 2.3.5 After the external door is opened, if no person is detected within the specified time, if the external door is opened first, the system will be transferred to the process of entering the clean area; if the internal door is opened first, the system will be transferred to the process of leaving the clean area. . 2.3.6 After the lights are on, if they are not triggered again within the specified time, they will automatically extinguish. Three: Wind / cargo shower room maintenance 3.1 Precautions: 3.1.1 After the air/charge shower is energized, both doors are electronically interlocked. When the side door is not fully closed, it is strictly forbidden to open the other side door. 3.1.2 Do not open the door when the cargo shower is in the showering state (until the showering stops). In case of emergency, you can press the emergency stop switch to stop the shower. 3.1.3 It is strictly forbidden to open the front door after the shower is finished. 3.1.4 The air / cargo shower room is operated by a special person. After the blowing nozzle is positioned, the non-operating personnel should not shift it easily. 3.1.5 The top pressure relief valve must not be sealed during installation. 3.2 Maintenance: 3.2.1 often wipe the wind / cargo shower room, keep the interior clean. 3.2.2 It is recommended that the primary effect filter be changed once every month, and the replacement period can be appropriately extended or shortened depending on the actual use. Note: To replace the initial effect, first remove the air inlet panel at the lower part of the air shower, pull the primary filter out of the box and replace the filter material. The tool used is a 5-inch Phillips screwdriver. 3.2.3 When the blowing speed is significantly reduced, high efficiency filters need to be replaced. Note: When replacing the HEPA filter, remove the nozzle panel inside the air shower and remove the high-efficiency bead and replace the HEPA filter. The nozzle panel uses a 5-inch Phillips screwdriver; the loading and unloading high-performance presser uses a 14-inch open-end wrench. Note: High-efficiency filter materials are easily damaged, please pay attention Four: Common Faults and Handling 4.1 Abnormal equipment, please check the following table for self-inspection, if you can not eliminate the fault, please contact the manufacturer after-sales service department to contact the maintenance. Warning: Cut off circuit breaker and power switch when checking and replacing parts 4.2 Common Fault Causes and Handling malfunction phenomenon cause of issue Approach Low wind speed 1, the three-phase power phase sequence is incorrect Re-adjust the phase sequence of the three-phase power supply 2. The use of high-efficiency filter is too long, resulting in high-efficiency blockage Replace HEPA filter 3, early effect filter is too long to use, resulting in early effect blockage Replace primary filter Fan does not turn 1ã€Incoming air switch tripping Check for short circuit or leakage 2. Damage to the electrical components in the distribution box Replace damaged electrical components 3, the fan phase burned Replace the fan 4, the fan working time is too long to burn Replace the fan 5, fuse blown Replace the fuse Fans do not stop 1, the middle relay is damaged Replace intermediate relay Illumination is off 1, fluorescent aging Replacing fluorescent lamps 2. Rectifier burnout Check the voltage and replace the rectifier Zhejiang Sujing Purification Equipment Co., Ltd. is located in Daoshui Town, Shangyu District, Shaoxing City, Zhejiang Province. It is an excellent manufacturer in the purification equipment industry in East China. Can provide professional air purification systems for industries such as microelectronics, biomedicine, hospital operating rooms, fiber optic cables, food and beverages, precision instruments, semiconductors, and new material applications in accordance with the ISO14644-1 standard, GB50073-2001 national standard, and national GMP specifications. Engineering design, construction, testing and technical services.
Our Cat6A Patch Cord is quality-guaranteed. We make 100% Cat.6A Patch Cord test by FLUKE. For Cat.6A patch cord. We ship over 800,000pcs this year. with dedicated R & D, our products have received the patents from 10 countries. Welcome any enquiry related to Cat6A Patch Cord and RJ45 Connector, we will reward you with good product and good services!
Test: 100% Component Test (patch cord test optional for Cat5E Patch Cord).
Please go to "Video" for on-site testing.
Cat6 component test pass
Please go to "Video" for on-site testing.
Cat6A Patch Cord Cat6A Patch Cord, Cat6a Cable, Cat6A Lan Cable Ningbo Excellence Communicated Connector Co., Ltd , http://www.patchcordmaker.com
The company's main purification table series, air shower series, fume hood series, biological safety cabinet series are widely used in medical and health, electronics, pharmaceuticals, biology, food, agriculture, forestry, animal husbandry and veterinary, inspection and quarantine, aerospace, automotive manufacturing, Precision instruments, universities and research institutes enjoy a high reputation in the domestic and Southeast Asian markets.
Zhejiang Sujing Purifying Equipment Co., Ltd. is dedicated to serving consumers and distributors all over the world. We will provide you with the best quality products, the most humane services and the lowest price. We sincerely welcome you to join us!
Cat6A component test pass
All products, including packaging materials are RoHS/REACH compliant.