Coil Decoiling and Cut to Length Machine

Model NO.: HFCL
Speed: 30-80m/Min
Coil Internal Diameter: 508/610mm
Coil External Diameter: 1000-1800mm
Length Measuring: Servo Motor or Encoder
Trademark: HuaFei
Transport Package: Plastic Film Cover or Plywood Case
Specification: according to work piece
Origin: Jinan
             PLC control Coil cut to length line for uncioling leveling shearing and stacking

**********
Thin plate cut to length line (0.2-4.0mm)

 1.   Used for metal plate coil uncoiling, leveling, set length, cutting the set size and stacking. This line used for processing cold rolled and hot rolled carbon steel, silicon steel, tinplate, stainless steel and other different kinds of surface plating metal.

 2.   Cut to length line is mainly composed of entry coil car, uncoiler, leveler, looping bridge, side guide, servo feeding device, shearing machine, transfer table, stacking device, etc. This line can configure trimming device.
 
3.Parameters
 
Model No.
Parameter
Coil thickness
(mm)
Coil width
(mm)
Shearing precision/set length (mm) Shearing speed (pcs/min)/set length (mm) Coil
weight
(T)
Stacking length (mm) Remark
HFCL-2×1300 0.2-2 200-1300 ±0.5/2000 22pcs/min/2000 10T 500-2000 Technical data, configuration can according to customer requirement.
HFCL-2×1600 0.3-2 200-1300 ±0.5/2000 22pcs/min/2000 15T 500-3000
HFCL-3×1600 0.5-3 200-1300 ±0.5/2000 20pcs/min/2000 15T 500-3000
HFCL-3×2000 0.5-3 200-1300 ±0.5/2000 20pcs/min/2000 15T 500-3000
HFCL-4×1600 1-4 300-1600 ±0.5/2000 15pcs/min/2000 20T 500-4000
HFCL-4×2000 1-4 300-1600 ±0.5/2000 15pcs/min/2000 20T 500-5000
 
*********
Thick plate cut to length line (4-22mm)

1.  Cut to lenth line is used to cut hot-rolled steel coil, stainless steel coil, aluminum coil, cut into various specifications of the size, this line also can have trimming function, make the width size meet customer requirements

2.  This cut to length line is composed of entry coil car, uncoiler, material-feeding device, simple leveler,  transfer bridge, trimming shearer(optional), leveler, setting length device, plate feeder, cutting device, transfer table, thrower stacking device, Hydraulic system and electric control system
   
3.    This production line hydraulic system main parts adopt Germany BOSCH-REXROT components and seals, electrical control adopt Japan Mitsubishi PLC program controller and Taiwan WEINVIEW touch screen to control all functions, main motor of leveler adopts high power DC motor, DC controller adopts ETD products, which has high degree of automation, high shearing precision, stable and reliable performance, easy operation and maintenance, etc

4. Parameters
 
Model No./parameter Coil thickness
(mm)
Coil width
(mm)
Shearing precision/set length (mm) Shearing speed (pcs/min)/set length(mm) Coil weight
(T)
Stacking length
(mm)
Remark
HFCL-6×2000 1-6 500-2000 ±0.8/2000 10pcs/min/2000 30T 500-6000 Technical data, configuration can according to customer requirement.
HFCL-8×2000 2-8 500-2000 ±2.5/6000 3pcs/min/6000 30T 500-8000
HFCL-10×2000 2-10 500-2000 ±2.5/6000 3pcs/min/6000 30T 500-10000
HFCL-12×2000 3-12 500-2000 ±2.5/6000 3pcs/min/6000 35T 500-12000
HFCL-16×2200 4-16 500-2200 ±2.5/6000 3pcs/min/6000 35T 500-15000
HFCL-20×2200 4-22 500-2200 ±2.5/6000 3pcs/min/6000 35T 500-15000

******** 
Machine video link 

https://www.facebook.com/photo.php?v=1681723778734755

********
Service

Warranty: 12 months from the date of Bill of Lading.
The Seller shall bear responsibility for the entire machineries normally working during 12 months from the date of Bill of Lading. During warranty period, if are damages and disorders of equipment due to machine quality, The Seller shall be responsible for replacement of the defective parts with new parts. The warranty shall also include performance functions as defined in the offer. In the case that there is any defect The Buyer shall inform The Seller in writing and photos of the broken parts. The Seller will assist and deal with such damages within 15 days from receipt of The Buyer's above information.
The Seller doesn't guarantee the spare parts which are easily worn out / damaged. The Seller deems it his responsibility to furnish The Buyer these spare parts at prices reasonable or agreed.
The Seller doesn't guarantee equipment in case faults caused by operators' improper operation or electric source's breakdown.
 
Service condition:
1) When Sellers send engineer to Buyer's place for Installation, Commissioning and training for the machine in this contract in Buyer's place, Buyer shall undertake all the relative fees like, all tickets, accommodation for Seller's engineers.
2) Seller shall, within one week of receiving the above information, provide the required and qualified personnel to undertake supervision of installation, commissioning and training.
3) If the Buyer needs the service after sales from Seller, then Buyer shall undertake all the relative fees, like Round Tickets, Accommodation, Internal and international transportation, Labour cost of engineers etc.
4) When the Seller's engineer carries out the services in Buyer's place, Buyer shall arrange a Translator that can speak Chinese for Seller's engineer.
5) Labour cost for engineers: 80.00 USD per person, per day.
Â