Electromagnetic flowmeter installation site requirements
Fishing Gumboots,Neoprene Hip Boots,Fishing Rain Boots,Rockfish Rain Boots Dongguan JinYe Sports Apparatus Co., Ltd , https://www.yuwos.com
Electromagnetic flowmeter installation site requirements:
1) When measuring a mixed-phase fluid, choose a location that does not cause phase separation. Avoid placing the mixture in a well that has not yet been homogenized while measuring the two-component liquid. When measuring the chemical reaction pipe, place the reaction well downstream of the well-
2) try to avoid measuring tube into negative pressure;
3) Select the place of small vibration, especially for one type of instrument;
4) Avoid near a large motor, a large transformer, so as to avoid electromagnetic interference;
5) easy to achieve a separate sensor grounding place;
6) as far as possible to avoid the surrounding environment has a high concentration of corrosive gases;
7) The ambient temperature is in the range of -25 / -10 ~ 50/600 ℃, the temperature of the integrated structure is also subject to the electronic components, the range should be narrower;
8) relative humidity in the range of 10% to 90%;
9) try to avoid direct sunshine;
10) to avoid rain soaked, will not be submerged.
If the degree of protection is IP67 (dust-proof and water-proof) or IP68 (dust-proof and anti-diving), there is no need for the above two items 8) and 10). (Source: Huaian Hua Jiang Automation Instrumentation Co., Ltd.)