Forging Parts Drill with CNC Machined for Farm Machine Use
Water Pump For Desalination Plants Vertical Submerged Pump,Water Pump For Desalination Plants,Forced Circulation Pump Of Prc,Prc Axial Flow Pump Sichuan Zigong Industrial Pump Co.,Ltd. , https://www.zgpump-global.com
Specifications:
Description:
Agricultral part
Application:
Agricultral part
Material:
SS304
Material Grade:
GB, ASTM , AISI , DIN , BS, JIS, NF
Drawing Format accept:
Pdf,Jpg,CAD,IGS,STP,Pro-E
Mould Tooling:
Made by CNC Machine
Casting Process:
Mainly Machining Process:Investmen Casting
By CNC
Surface Roughness
Ra1.6
Lead time for sample
25-30 days
Delivery for normal order
30-35 days
Heat Treatment
Anealled
Surface treatment
Sand blast
Payment terms
T/T or negotiable
Delivery port departure
Ningbo, Shanghai port
Test Equipment:
Â
Why Choose us:
*Zhongda had been engaged in Casting and Machining industry for more than 18 years.
Â
*The whole production cycle is monitored by our Quality Management System ISO 9001:2008 certified.
* We now supply all forms of casting parts and cnc machining parts:  lost wax investment casting, sand casting, and cnc machining services.Â
Â
* Rich OEM service experience.
Â
* Our products has been sold to more than 30 countries, we are very familiar with the whole markets, expecially for Europe, North America,Australia and Canada markets.
Â
* Our Commitment & Responsiblity:
   1.Competitive Price
   2.Strict Quality Control
   3.Quick Response To Any Inquires,Complaint,Technical Problem,etc
   4.Timely DeliveryÂ
     5.Small Quantity Acceptable
FAQ:
1. How long can I get the price?
Prices will be quoted within 24 hours after we get your inquiry with detailed information ( including drawings, material, surface treatment,quantity, special requirements,etc).
Â
2.How can I get a sample to check your quality?
On the case of quotation confirmed.Sample will be free of charge for customer approval, freight collect.
Â
3.How long can I expect to get the sample?
It depends on, normally 25 days~30 days (including mould making time). Samples will be shipped by DHL, FedEx, UPS, TNT or EMS,ect.
Â
4.What about the leading time for mass production?
It depends on the order quantity. Normally, 30~45 days after receiving of deposit.Â
Â
5.What is your MOQ?
We don't have a strict limit, small quantity is also workable.
Â