Sbme125 MIG Welding Torch
B&B EC CO., Ltd. , https://www.hi-cfm.com
sbme125 gas welding torchÂ
Item
MIG/MAG HRSBME 125 Air-Cooled CO2/Mixed Shielded Welding Torch
Rating
250A CO2/220A Mixed Gas , Duty Cycle 60% Wire Diameter: 0.8-1.2mm
Rear Connector
Euro Connector
Certification
ISO9001, CCC, CE, ROHS, TUV
Packing
1set/box neutral packing, 5sets/Carton Box
Â
Â
Welding Gas Nozzle/ CO2 torch nozzle
Â
HRME511
Nozzle ¢15
HRME536
Nozzle ¢12
Welding Contact tip / Torch tip
Â
MA020
Contact Tip E-CU M6*37*0.8mm
MA021
Contact Tip E-CU M6*37*0.9mm
MA022
Contact Tip E-CU M6*37*1.0mm
MA023
Contact Tip E-CU M6*37*1.2mm
Welding Torch Liner
Â
124.0026
Red Steel Liner 1.0-1.2mm, 3mÂ
124.0031
Red Steel Liner 1.0-1.2mm, 4m
124.0035
Red Steel Liner 1.0-1.2mm, 5m
Welding Torch Spare parts: Gas Diffuser, Tip holder, Insulator, Swan neck
Â
1.HRMB 401
Tip Holder
2.HRMC 440
Insulator
3.HRMF 571
Swan Neck
Changzhou Huarui Welding & Cutting Co., LTD
Since the establishment in 1985, we have become one of the biggest manufacturers of welding
and cutting equipment and accessories in China by modern manufacturing equipment and
special technology. We are specialized in manufacturing MIG, TIG, PLASMA, Welding Torches
and Spare parts. With Euro connector, Lincoln connector , Miller connector and Tweco connector,
we can fit different kinds of foreign equipments.
1.MIG Welding Torch
Binzel,Bernard,Tweco,Esab,Lincoln/Tregaskiss,Panasonic/OTC, MAXI,Kemppi,Fronius,Mechafin.
2.TIG Welding Torch
WP-24, WP-9,WP-17, WP-26, WP-20, WP-18, etc.
3.Plasma Cutting Torch
Trafimet, Cebora, Panasonic/Esab
FAQ
Q1: Can I get a samples to check the quality?
A:Sure,we can supply samples. For regular goods, the sample cost is different from the amount
you want.For our new products, there's a MOQ of the samples.
Q2: Can I put my logo on the boxes/cartons?
A: Yes, this can be made according to your requirements, but you should send us the trademark
authorization letter.
Q3: How can you guarantee your products quality ?
A: Huarui's each torch must pass the following tests before packing: Insulation resistance test,
High voltage test,Air/Water flow test, Air/Water seal test.
If there are defective items, we usually credit to our customer or replace in the next shipment.
Q4: What's the order procedure?
A: Firstly, we discuss the details together by e-mail or TM. Then we issue you a PI for your
confirmation or Trade Assurance Order Payment Link. You will be requested to do the pre-paid full
payment before we go into the production. After we get the payment, we start to process the order.
It usually takes 5-15days if we don't have the items in stock.
Â