Vibration table troubleshooting and maintenance
Plastic Pipe Vacuum Calibration Tank
The Molten Extrudate in The Extruder Is Drawn into The First Vacuum
Chamber Through Calibration
The Vacuum Then Forces the Plastic Against the Calibration Tool While
Cooling Its Surface Enough to Maintain Proper Dimensions. Cooling Water Enters the
Chamber Through the Spray Bar.
The Calibrated Plastic Is Pulled Through a Second Vacuum Tank, Where It
Is Cooled by Water Filling the Compartment. A Vacuum Can Be Applied to The
Chamber to Help Maintain the Shape of The Plastic Product.
Depending On the Size of The Pipe, The Cooling System of The Vacuum
Sizing Machine Can Be Cooled by Spray Cooling. Generally, Full Immersion Is
Required When the Pipe Diameter Is Small, And Spray Cooling Is Appropriate When
the Pipe Diameter Is Large.
After Cooling, The Plastic Product Passes Through the Final Chamber. The
Rollers Help Guide the Plastic Through the Vacuum Setting Machine.
Plastic Vacuum Calibration Tank,Vacuum Tank,Plastic Pipe Calibrator Zhangjiagang Polestar Machinery Co.,Ltd , https://www.polestar-machine.com
Vibration test bed troubleshooting:
1. The amplitude knob is turned to maximum, abnormal noise and table movement occur. The main reason is that the operating current is large, and the amplitude out of control is beyond the self-adjustable <5mm control. The small amplitude knob should be adjusted to control this fault.
2. There is a slight “click†sound during work. The table top should be dismantled and inspected for breakage of the vibration springs, whether the screws are fixed or not, and then removed or replaced.
3. After turning on the power, the power switch light is off, check whether the power supply is connected properly.
4. Turn on the amplitude knob switch. If the vibrating table does not work, check whether the output terminal is connected properly and whether the power supply is burned out.
5.Before installation, the foundation should be laid first, and the ground plane of the ground should be leveled according to the level, and the bottom frame bolts should be pressed, and then the installation should be done so that the fixing bolts must be tightened.
6. When the installation is completed, first stop the car after 3-5 minutes to check all the fastening bolts. If it is loose, be sure to use it. 7. In the real process, concrete products should be firmly fastened to the vibration table. The required vibration products should be placed symmetrically with the countertops and load balanced.
Vibration test bench maintenance:
1. Bearings should be inspected regularly and dismantled and replaced regularly to replace the lubricant so that the bearings maintain good lubrication.
2. There should be a reliable grounding wire to ensure safety.
3. There should be professional technicians to control independently to ensure the correct operation method.